129771798648531060_103Recent a about vanke [introduction latest dynamic] hardcover repair housing with "paper" do decoration material of network posts in all large Forum in spread, posts said had claimed "each square sent 3,000 yuan fine decoration" of Shenzhen vanke v Park six period appears has large area moldy, and wall surface paint off, decoration problem, has owners apart decoration material a see: wardrobe, and shoes Cabinet, has is"Paper". "The best decoration in the history" with the paper a few days ago, some Internet users online, sell for between $ 4 million and $ 2.5 million each in Shenzhen wanke v Park Phase six, there was a "paper" decoration materials, and so on. Internet post says, "Sales Office publicity decoration 3,000 yuan/sq m, are branches best decoration ever. ButThe owners collection of the room only to discover, it was a room full of junk, and some owners to rectify maintenance for several months is appalling. Most of jingxin is, wanke new materials were used "paper", as the owners of interior doors ". Also post a lot of pictures in the Internet post, has been apart not only looks like a sheet of paper materials, down from the interior furniture of suspected paperMaterials, all kinds of mould decoration material, there are holes of the ceiling
tera gold, rusting shades, floor tiles cracking. "Cardboard" poor quality cheap decoration for netizens claimed, reporters went to Shenzhen vanke garden v six issues field surveys, many owners had to get branches decorated the Shoe cabinet, wardrobe, door frames, and so removed, aims to show thatSome furniture "essence of polished under appearance". On January 15 this year, new house owners of the original told reporters that as many owners of shoe racks, cabinets, have all appeared in large areas of green mold, we suspect branches decorated with "paper" material problems, China vanke replied: this is a "density", quality. 22nd, reporters from China vanke garden six vOwners part of decoration plates out of the House, visited the Shenzhen News building, Futian District, an engineer officer responsible for the decoration of the building after seeing journalists sheet replied: "it was a fibreboard, industry known as" cardboard ", in contact with water easily gets damp, after long study, the price is very cheap. "Owners, Lady Yang told reporters that shortly before the exposure of the vanke" trapdoor "Have shaken confidence in all branches decoration, therefore "exit door" following the incident, many owners increased vigilance, reject the floor. Owners began negotiations organized with vanke, China vanke company is currently six phases, wanke v Park maintenance. Vanke response: recognition of the problem "rectification" Yu Liang, President of China vanke a reporter interview admitted that: Vanke garden v six-phase there are quality problems
tera power leveling, flaws, is currently house investigation, and rectification and reform. "What we are not doing enough, we replace all". Fitment problems that occur primarily in the Cabinet now back from the musty, stone grey, paint damage, and so on. Owners told a press conference, taking into account the main structure of the House after the acceptance,Is not ready to check out, but were interested in solving fitment issues as quickly as possible. Journalists found that the large areas of decoration project quality problem, mainly for the following reasons: one is the renovation contract for decoration materials for specific conventions. Journalists view the six owners, wanke v park renovation project trust agreement, found the two sides do not have repair material brands,Model conventions. Second, decoration materials often change you. Owner says, "when they buy a House, sales people say" fully in accordance with the model of the standard decoration ", but found when taking what goods do not. "Third" work "lead to poor process. Shenzhen real estate research center director Wang Feng believes that due to the quality supervision Department of decoration of quality acceptance inspection is notFeet, and the owner is not a comprehensive inspection
tera gold, can only look at the surface, so many problems it is difficult to find. If this continues, decoration also frequency is now. Therefore, the renovation process should be transparent, decoration materials and clearly in breach of the contract terms and conditions. Vendors and developers should step up the quality and process management. Quality inspection departments should increase both decorated part of the checks andThe appropriate punishment.
Others:
No comments:
Post a Comment